top of page

Work Continues In The Kitchen

Jun 5, 2014
1 min read

New kitchen opening

Work has continued in the kitchen in spite of the rain. It's a good thing we haven't had heavy rain and if anything, the mild rain is good for the curing of the concrete slab as it helps cool it down. The builder has finally relented and agreed to follow the building inspector's recommendation. We now have a thin plastic sheet over the slab.

The steel beam has been installed over the new kitchen opening. We can picture the new kitchen space now, although the entire site looks like a bomb's exploded in there. And still it continues to rain...

 
 
 

Comments


Featured Post
Search By Tag
Follow Us
  • Facebook Basic Square
  • Twitter Basic Square
  • Google+ Basic Square

© 2014 by BVCLam. Proudly created with Wix.com

  • facebook
  • Twitter Round
  • googleplus
  • flickr
bottom of page