top of page

First Fix Plumbing

  • vvienl
  • May 23, 2014
  • 1 min read

First fix plumbing has begun. Brandon was on site early in the morning. The plumbers were given our printed plans for the placement of waste outlets, water inlets and everything else plumbing related. We have marked out everything on the plans, with detailed measurements down to the last mm. Because we have chosen European back to the wall, close-coupled WC, placement is critical!!! All the plumbing parts we imported from the UK were on site for measuring if needed.

Lots of digging for the day
Lots of holes

After a full day's work, we now have pipes sticking out everywhere.

Pipes in the backyard

Family bathroom

 
 
 

Comments


Featured Post
Search By Tag
Follow Us
  • Facebook Basic Square
  • Twitter Basic Square
  • Google+ Basic Square

© 2014 by BVCLam. Proudly created with Wix.com

  • facebook
  • Twitter Round
  • googleplus
  • flickr
bottom of page