top of page

Preparing For First Fix Plumbing

  • vvienl
  • May 22, 2014
  • 1 min read

It has been a crazy long day. First of all, we went to bed at 1am the night before and were up a 7am this morning to finalize all measurements for first fix plumbing. We have drawn up plans and measured out everything with a measuring tape to ensure waste and water inlet locations are placed correctly.

Imagine our panic and shock when we realised our plans have been drawn up incorrectly by Abela Design & Drafting. The measurements for the family bathroom were out by over 10cm. For most people, it's not the end of the world, but for us it's critical as we have such a narrow bathroom. This meant that we could no longer have the toilet hidden behind the wall as we do not have enough room. A frantic last minute reshufle meant we had to reposition the toilet, vanity and bath.

We spent a long 4 hours with the builder on site today, marking out all the waste and inlet location. I'm still not 100% confident so I'm going to type up and draw out all the measurements on the plans for the plumbers. We have purchased Villeroy & Boch toilets and sinks and Hansgrohe tapware. The location of the waste outlets and water inlets for the VB toilets are critical as they are back to the wall close-coupled toilets. if the plumbers make a mistake with the placement of the pipes, we are in big trouble!!! This is extremely nerve-wrecking.

Waste outlets marked out

Family bathroom

 
 
 

Opmerkingen


Featured Post
Search By Tag
Follow Us
  • Facebook Basic Square
  • Twitter Basic Square
  • Google+ Basic Square

© 2014 by BVCLam. Proudly created with Wix.com

  • facebook
  • Twitter Round
  • googleplus
  • flickr
bottom of page