top of page

Ensuite Ready For Concrete Pour

  • vvienl
  • May 16, 2014
  • 1 min read

2014-05-16 17.33.42.jpg

2014-05-16 17.33.37.jpg
2014-05-16 17.33.28.jpg

After a full day's work, the former bedroom is now ready for the concrete pour. The room will be split in half to make the ensuite and the WIR. It was a tough decision working out if an additional bedroom was worth the sacrifice for an ensuite. But in the end, having an ensuite made more sense.

 
 
 

Comentarios


Featured Post
Search By Tag
Follow Us
  • Facebook Basic Square
  • Twitter Basic Square
  • Google+ Basic Square

© 2014 by BVCLam. Proudly created with Wix.com

  • facebook
  • Twitter Round
  • googleplus
  • flickr
bottom of page