Time to Begin Work
- vvienl
- Jun 8, 2013
- 1 min read
It's the Queen's Birthday weekend and we thought it would be the best time to begin work on painting the guestroom. We are currently living in the second bedroom which will be converted into the WIR and ensuite with the renovation and so we will need to move our things into another room when the renos begin. The master bedroom is not an option as we will be cutting a doorway into the wall to connect the master bedroom with the new WIR and ensuite.
I hav decided that the guestroom should be a French gray, which should contrast elegantly with the black chandelier we have in that room. But before we could begin painting, there were lots of cracks and sanding back to do. So hubby put on his DIY coat and started work on filling in the cracks and sanding the walls back. With ceilings over 3 metres high, it is turning out to be quite a tedious task.
Kommentarer